
Extension of Production Plant
The second phase is the extension of the existing buildings in the company’s indoor complex focused on the production of alloy wheels for cars. It consists of two single-bay, single-storey buildings based on bored piles with bored heads. The hall is made up of columns with perimeter plinths and the roof structure consists of beams and perimeter braces. After completion, the building will be used as for production and warehousing, with shipping facilities. The dimensions of the structure are 120 x 60 metres.
| Location: | Mošnov |
| Type of Construction: | Production Hall and Warehouse |
| Investor: | CROMODORA WHEELS s.r.o. |
| Designer: | Tebodin Czech Republic, s.r.o. |
| Start of Construction: | 8 / 2015 |
| End of Construction: | 8 / 2015 |
| Contract Value: |